Eskom lauds progress at Cahora Bassa

cahora bassaBy TINTSWALO BALOYI

JOHANNESBURG, (CAJ News) – MAINTENANCE at the Cahora Bassa Dam in neighbouring Mozambique is this week poised to add stability to South Africa’s power system.

Eskom, the power utility, reported that work at the hydroelectric dam had been progressing well, with exports to South Africa expected to gradually ramp up from Monday.

Eskom expects to get the full 1 500MW from Cahora Bassa on Tuesday.

Meanwhile, the power system is stable and no load shedding is currently taking place.

“Only 2 hours and 20 minutes of load shedding has been implemented in the past 43 days. And, since it was stage 1 load shedding, this meant that 96 percent of South Africans still received uninterrupted electricity supply on that day,” Eskom stated.

The company nonetheless urged the public to make a positive difference by reducing electricity usage at home and at the office.

CAJ News

 

 

 

 

 

 

Short URL: http://cajnewsafrica.com/?p=8273

Posted by on Sep 21 2015. Filed under Africa & World, Electricity, Energy, Exclusive, Featured, Finance, Finance & Banking, National, Regional. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

CAJ News Sponsored Links

Commonwealth Technology Organisation

Connect to CAJ News on Facebook

Subscribe to our Newsletter

Photo Gallery

Log in
All material © CAJ News Africa. Material may not be published or reproduced in any form without prior written permission.